A chain link fence is only as good as its posts and its tension. This is the sequence a fencing gang follows, and the points that decide whether the fence stays tight.
By Pratyush Agarwal, Agarwal Gabion Industries · Updated
Set out the line and mark every end, corner, gate and change of level — each gets a straining post.
Fix the straining posts with their struts in concrete and let it cure. The tension of the whole fence hangs on these.
Fix the intermediate posts in line and to height between them.
Run and strain the line wires — top and bottom, and middle on fences over 2 m — from straining post to straining post.
Unroll the fabric along the fence, stand it up, and fix one end to a straining post with a stretcher bar threaded through the last row of diamonds.
Stretch the fabric from the far end until the diamonds stand square and the mesh rings when struck, then fix it with a second stretcher bar.
Tie the fabric to the line wires and posts with binding wire at close, even intervals.
Join rolls by unwinding one helix from the end of a roll and winding it back through the end diamonds of both — the joint disappears.
Finish the top with barbed wire on extension arms or a concertina coil where specified.
On uneven ground
Chain link follows a slope better than any rigid fence: the diamonds rack to the gradient. Step the posts to the ground, keep the bottom line wire close to the soil, and on steep ground cut the fabric on the bias at the straining posts instead of forcing it.
Common mistakes
Straining posts without struts — the fence slackens within a season.
Leaving out the line wires — the fabric bellies and can be lifted from the bottom.
Straining posts with struts are set at ends and corners, intermediate posts between, line wires are strained between the straining posts, and the fabric is stretched with stretcher bars and tied to the line wires and posts.
How do you join two rolls of chain link?
Unwind one helix of wire from the end of a roll, bring the two rolls together and wind the helix back through the end diamonds of both. The joint is as strong as the fabric and cannot be seen.
How many line wires does a chain link fence need?
Two — top and bottom — for fabric up to 2 m high, and three for fabric of 2.5 m and above (IS 2721:2003).
Can chain link fencing be installed on a slope?
Yes. The diamonds rack to follow the gradient; step the posts and keep the bottom line wire close to the ground.
Indicative guidance only. Figures here are rules of thumb
drawn from published guidance — IS 2721:2003 for early planning and for checking a BOQ.
Every structure needs a design by a qualified engineer for its own site, soil and water conditions.